I was thinking of building a 19″ rack for holding my server and my switch…
So I made myself the beginning of a rack π
Category Archives: The Block Tom
The Block Tom
Sound install
Garage Rebuild *14*
Paint – CHECK π
Floor – CHECK π
So in a few hours, I’ll be placing the baseboard’s … “plintjes” we call them π
Then it’s over and out with ‘the block’
Garage Rebuild *12*
Here we go again !
Since there was NO MORE GYPROC, the things left are:
- Closing up the gaps
- Scrubbing down the left over plaster
- Placing the corner thingies :p
- Painting the whole place
- Placing the floor
- installing my shit in there π
This is Part 1 … first 3 pic’s show the 1st layer (my work) … last 3 pictures show the work of a gf of mine ! What an Angel !
Garage Rebuild *11*
There !
No more gyproc !
behold:
Garage Rebuild *10*
*woop**woop**woop**woop*
… The weather got alot better … providing me with enough heat to get going again π
What I did next:
Finish the walls surrounding the windows, finish the door panel, build a wall for the hall, start to hang the door …
Garage Rebuild *9*
PRAISE TO THE WEATHER GODS MAN !
This weekend, the weather was cold, but fine !
It didn’t rain and that was all I needed to get my work on the outside done !
Pic’s 1 trough 7: Coming out of the garage into the house ( which wasn’t easy, knowing the house is made of concrete with irons beams inside the concrete ) with the cables in the tubes, 2 times STP for network, 1 tv cable, 1 electrical wiring cord…
The holes are already closed up with TEC-7, but I didn’t take a picture of that … sorry mate :p
Garage Rebuild *8*
Due to the crappy weather nowadays and the need to get this fixed BEFORE doing anything else inside, I was in need of a nice day…without rain π
This is the result of and hour of digging π -> Few meters long … +-35cm deep.
That’s all for the update … except that every electrical wire inside is hooked up and working as it should be :p
Garage Rebuild *7*
Hello Ladies …
It’s been awhile since I updated the blog… mainly because I have been pretty busy with everything else :p
Update contains: Locked away gate … one window out … all studs for walls set … all electrical lines in place … all tv, network and beamer cables in place …
It has been quite the pain in the ass getting everything as I want it π
See for your yourself …
- Window got out π
- Entry corner
- This is were the TV is going to be placed …
Lower row is the wall were the garage door used to be π
Smell ya later Mr. poopypants !
Garage Rebuild *6*
Placing metal studs for gyproc π
All the wall’s except at car entry level are done, I have put some gyproc with isolation on… looks fine π
- Studs around the window
- Studs in front of the wall
- Here he (Moses) is again … enjoying some wool :p
- Plates that are going to be used
- Wall
- WallΒ²
I got a little further than this, but this will be visible a bit later on π